Place of Origin Shandong, China
Warranty 1 Year
Weight (KG) 2000
Video outgoing-inspection Provided
Machinery Test Report Provided
Warranty of core components 1 Year
Core Components PLC, Engine, Bearing, Gearbox, Motor, Pressure vessel, Gear, Pump
Key Selling Points Easy to Operate
Applicable Industries Manufacturing Plant, store, Lithium battery, Chemistry, Hazardous waste, Landfill leachate, Agitator tank, Reaction still
Showroom Location None
Condition New
Brand Name J-JD-03
Name Spiral wound storage tank production line
Production efficiency High
security High
Heating method Electric heating
Equipment investment Low
Mode of production Continuous spiral winding
Equipment type custom
Final product PPH
Equipment power 160kw
Vehicle requirement More than 5 tons
Packaging and delivery
Plastic Wrap + Pallet + Container
Port Qingdao
Supply Ability
Supply Ability 120 Set/Sets per Year
Show less
Lead time
Customization
Introduction of PPH winding storage tank equipment
Continuous winding tank equipment is a kind of energy-saving and environmentally friendly process that can be continuously wound and molded, the winding length of the tank can be adjusted at will, and there is no need to repeatedly bake the molds with gas and cool the molds, which is energy-saving and environmentally friendly, highly efficient, easy to operate, and uses less labor.
We can produce tanks, reactors, spray towers and pipes of various specifications.
Product process introduction:
Our company developed and produced the new pH winding tank equipment, different from the traditional tank winding equipment, no need to use drum mold production, directly winding molding;
It can achieve the diameter specification from 1000mm-5000mm between the large span production, can also be customized according to the requirements, different diameter of the tank can also achieve the continuous winding of any length;
The produced tank is a molding, no welding seam, internal and external wall flat, more safe and durable;
Production without fire baking, energy saving and environmental protection;
The winding forming module is light in weight, easy installation and high safety factor.
Scope of production
The whole tank production line can produce pipe diameter: 1000mm, 2000mm, 2200mm, 2500mm, 2800mm, 3000mm, 3200mm, 3500mm, 4000mm, 4500mm, 500 mm, 5000m, and can also be customized for specific sizes.
Bottom inside welding process
Reservoir production line configuration advanced automatic horizontal long arm extrusion rotary welding unit, once complete important tank bottom internal welding work, increase the tank bottom pressure capacity, prevent the emergence of leakage phenomenon, can effectively extend the service life of the whole product for up to 10 years, stationary state even can even reach the service life of 15 years.
Production principle of pph winding storage tank equipment
●The modified PPH particles are fused through the high efficiency single screw extruder and squeezed with a certain width and thickness through the sheet mold for high temperature melt PPH sheet. On the PPH tank winding machine, winding set bone rods are mounted through specific specification positioning discs and positioning holes to form a circular winding cage.
●The high temperature molten PPH sheet is wound on the circular winding cage and wound continuously with the rotation of the bone rod. There is a certain spiral Angle on the axis of the winding cage, so that the winding forming tank can be moved forward, and the continuous winding PPH sheet is wound into a continuous forward tank for continuous production.
●The cutter can cut and wrap the tank at any set length. The cut wound tank is welded by the internal and outer tank and the tank opening to produce a complete PPH winding tank.
Advantages of equipment
● The length of the wrapped tank can be adjusted at will and cut off as required. Not subject to the die length limit.
● The winding mold is not heated by repeated open fire, and then cooled repeatedly. Solve the resulting energy consumption, open fire combustion brought by environmental protection, safety risks (do not need fire approval). Reduce the number of personnel, improve the production efficiency.
● The equipment adopts split body and combination mode to facilitate the production at the construction site. Solve the problem that the super-large tank body cannot be transported. Reduce transportation costs, thus increase product competitiveness
● The continuous winding process can also save the investment of lifting and driving. Only need to install a small tonnage lifting car to meet the weight of the tank (10 tons of driving can be enough)
● There is no need to invest in multiple winding molds, and the equipment investment is lower than the traditional one.
Recommend
Online consultation
By clicking 'Allow All', you agree to the storage of cookies on your device to enhance site navigation, analyze site usage and assist with our marketing efforts. Coo Cookie Notice